=================================================================== Tohban report: 2008-10-07 to 2008-07-13 Produced at 16:00 PST on 2008-07-13 (at Berkeley) Checked data from: 2008-10-04/00:00 UT to 2008-10-12/24:00 UT (to 2008-10-10/21:30 for THC) =================================================================== Data quality/collection status ============= FGM: A: 10/04-10/12 full data coverage B: 10/04-10/10 full data coverage C: 10/04-10/12 data gap from 10/10 19:20 to 24:00 D: 10/04-10/12 full data coverage E: 10/04-10/12 full data coverage ESA: A: 10/04-10/12 data gap from 10/07 20:00 till 10/08 06:00 due to earlier missed pass B: 10/04-10/10 data gap from 10/06 13:00 till 10/07 04:00 C: 10/04-10/10 data gap from 10/10 22:30 till 10/11 01:00 D: 10/04-10/12 full data coverage E: 10/04-10/12 full data coverage SST: A: 10/04-10/12 data gap from 10/07 20:00 till 10/08 06:00 due to earlier missed pass B: 10/04-10/10 data gap from 10/06 13:00 till 10/07 04:00 C: 10/04-10/10 data gap from 10/10 22:30 till 10/11 01:00 D: 10/04-10/12 full data coverage E: 10/04-10/12 full data coverage EFI filter bank data A: 10/04-10/12 data gap from 10/07 20:00 till 10/08 06:00 due to earlier missed pass B: 10/04-10/10 data gap from 10/06 13:00 till 10/07 04:00 C: 10/04-10/10 data gap from 10/10 22:30 till 10/11 01:00 D: 10/04-10/12 full data coverage E: 10/04-10/12 full data coverage SCM filter bank data A: 10/04-10/12 data gap from 10/07 20:00 till 10/08 06:00 due to earlier missed pass B: 10/04-10/10 data gap from 10/06 13:00 till 10/07 04:00 C: 10/04-10/10 data gap from 10/10 22:30 till 10/11 01:00 D: 10/04-10/12 full data coverage E: 10/04-10/12 full data coverage ================================= Instrument Ops (Highlights) #--------------------------------------------------------------------------------- # 2008/278 - 2008/279 Saturday, October 4 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2008/278 14:25:00 2008/278 15:20:00 TR9 # Data dump [MB] - applied track time bias of +104 sec with post-maneuver predicted TLE set BGS_11M THEMIS_C 9.400 2008/279 00:45:05 2008/279 01:15:05 TR10 # Data dump BGS_11M THEMIS_D 9.300 2008/279 04:10:15 2008/279 04:40:15 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/279 06:09:05 2008/279 06:39:05 TR10 # Data dump #--------------------------------------------------------------------------------- # 2008/279 - 2008/280 Sunday, October 5 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2008/279 12:18:15 2008/279 12:48:15 TR10 # Data dump - expect track time bias BGS_11M THEMIS_D 9.300 2008/280 04:06:50 2008/280 04:36:50 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/280 06:05:25 2008/280 06:35:25 TR10 # Data dump BGS_11M THEMIS_A 9.100 2008/280 10:06:15 2008/280 10:36:15 TR10 # Data dump #--------------------------------------------------------------------------------- # 2008/280 - 2008/281 Monday, October 6 Week 41 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 9.400 2008/281 00:24:25 2008/281 00:54:25 TR10 # Data dump BGS_11M THEMIS_B 9.500 2008/281 03:09:40 2008/281 03:39:40 TR10 # Data dump BGS_11M THEMIS_D 9.300 2008/281 04:03:25 2008/281 04:33:25 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/281 06:01:50 2008/281 06:31:50 TR10 # Data dump BGS_11M THEMIS_A 9.100 2008/281 07:46:35 2008/281 08:16:35 TR10 # Data dump - missed pass - real-time scheduling system went offline - data remain onboard #--------------------------------------------------------------------------------- # 2008/281 - 2008/282 Tuesday, October 7 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2008/282 04:00:00 2008/282 04:30:00 TR10 # Data dump BGS_11M THEMIS_A 9.100 2008/282 05:18:45 2008/282 05:46:10 TR10 # Data dump - survey SSR segment saturated for 9.4 hours due to earlier missed pass BGS_11M THEMIS_E 9.200 2008/282 06:01:00 2008/282 06:31:00 TR10 # Data dump WHS_18M1 THEMIS_E 9.900 2008/282 06:45:00 2008/282 07:00:00 TR3 # Engineering support - WS1 uplink and Doppler test WLP_11M THEMIS_E 2.630 2008/282 07:12:15 2008/282 07:32:15 #--------------------------------------------------------------------------------- # 2008/282 - 2008/283 Wednesday, October 8 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 9.400 2008/283 00:04:30 2008/283 00:34:30 TR10 # Data dump BGS_11M THEMIS_A 9.100 2008/283 02:52:40 2008/283 03:22:40 TR10 # Data dump BGS_11M THEMIS_D 9.300 2008/283 03:56:35 2008/283 04:26:35 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/283 05:54:45 2008/283 06:24:45 TR10 # Data dump WHS_18M1 THEMIS_E 9.900 2008/283 06:42:00 2008/283 07:08:00 TR3 # Engineering support - WS1 uplink and Doppler test #--------------------------------------------------------------------------------- # 2008/283 - 2008/284 Thursday, October 9 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 2.930 2008/283 19:30:00 2008/283 19:45:00 TR12 # SOH check and track [ML] - upload LM table V4 and RTS 17 and enable LM/RTS for controlling RCS Heater Service 1 BGS_11M THEMIS_B 2.930 2008/283 19:50:00 2008/283 20:05:00 TR32 # SOH check and track [ML] - upload LM table V4 and RTS 17 and enable LM/RTS for controlling RCS Heater Service 1 BGS_11M THEMIS_A 2.530 2008/283 21:01:25 2008/283 21:21:25 TR2 # SOH check and track [JT] - select filterbank trigger for particle bursts - ICCR_JSM70 BGS_11M THEMIS_D 2.740 2008/283 22:24:20 2008/283 22:44:20 TR2 # SOH check and track [JT] - select filterbank trigger for particle bursts - ICCR_JSM70 BGS_11M THEMIS_E 2.640 2008/283 22:59:10 2008/283 23:19:10 TR2 # SOH check and track [JT] - select filterbank trigger for particle bursts - ICCR_JSM70 BGS_11M THEMIS_A 9.100 2008/284 00:42:30 2008/284 01:09:05 TR10 # Data dump BGS_11M THEMIS_D 9.300 2008/284 03:53:10 2008/284 04:23:10 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/284 05:51:10 2008/284 06:21:10 TR10 # Data dump WHS_18M1 THEMIS_E 9.900 2008/284 06:38:00 2008/284 07:05:00 TR3 # Engineering support - WS1 uplink and Doppler test #--------------------------------------------------------------------------------- # 2008/284 - 2008/285 Friday, October 10 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2008/284 22:23:15 2008/284 22:51:45 TR10 # Data dump [JT] - pre-maneuver table loads - instrument safing via ATS BGS_11M THEMIS_C 9.400 2008/284 23:19:00 2008/284 23:43:00 TR9 # Data dump [JM] - pre-maneuver table loads - instrument safing via ATS MILA_9M2 THEMIS_C 9.400 2008/284 23:53:00 2008/285 00:41:00 TR9 # Data dump [JM] - place IDPU into safe mode - upload IDPU FSW 0x50 - turn on instruments - ICCR_JSM68 BGS_11M THEMIS_B 9.500 2008/285 02:30:00 2008/285 03:52:00 TR20 # Data dump [DP] - place IDPU into safe mode - upload IDPU FSW 0x50 - turn on instruments - ICCR_JSM68 - # select density trigger for particle bursts - ICCR_JSM70 BGS_11M THEMIS_D 9.300 2008/285 03:59:00 2008/285 04:29:00 TR40 # Data dump BGS_11M THEMIS_E 9.200 2008/285 05:47:40 2008/285 06:17:40 TR10 # Data dump WHS_18M1 THEMIS_E 9.900 2008/285 06:35:00 2008/285 07:01:00 TR3 # Engineering support - WS1 uplink and Doppler test #--------------------------------------------------------------------------------- # 2008/285 - 2008/286 Saturday, October 11 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2008/285 20:03:00 2008/285 20:22:25 TR10 # Data dump BGS_11M THEMIS_D 9.300 2008/286 03:46:25 2008/286 04:16:25 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/286 05:44:15 2008/286 06:14:15 TR10 # Data dump WHS_18M1 THEMIS_E 9.900 2008/286 06:31:00 2008/286 06:46:00 TR3 # Engineering support - WS1 uplink and Doppler test #--------------------------------------------------------------------------------- # 2008/286 - 2008/287 Sunday, October 12 #--------------------------------------------------------------------------------- TDRS_10 THEMIS_A 9.900 2008/286 18:17:00 2008/286 18:27:30 TR2 # ---> Apogee raise maneuver [JT] - P5 SM1B_T2 - MAN ID 220 - hand-over to TDRS 4 - nominal burn TDRS_4 THEMIS_A 9.900 2008/286 18:28:00 2008/286 18:58:00 TR2 # Hand-over from TDRS 10 [JT] - nominal hand-over with 50 sec TLM drop-out USNAU_13M THEMIS_A 9.100 2008/286 19:31:00 2008/286 19:48:00 TR10 # Data dump - all VCs USNAU_13M THEMIS_A 9.100 2008/286 23:00:00 2008/286 23:50:00 TR2 # SOH check and track [JM] - post-maneuver instrument operations BGS_11M THEMIS_C 9.400 2008/286 23:25:40 2008/286 23:55:40 TR10 # Data dump TDRS_4 THEMIS_C 9.900 2008/287 00:03:00 2008/287 00:16:00 TR2 # ---> Apogee raise maneuver [JM] - P2 SM1A_T2 - MAN ID 221 - nominal burn HBK_10M THEMIS_C 9.400 2008/287 00:35:00 2008/287 00:47:00 TR10 # Data dump - VC4 BGS_11M THEMIS_D 9.300 2008/287 03:43:00 2008/287 04:13:00 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/287 05:40:45 2008/287 06:10:45 TR10 # Data dump #--------------------------------------------------------------------------------- # 2008/287 - 2008/288 Monday, October 13 Week 42 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 9.500 2008/287 17:25:00 2008/287 18:15:00 TR2 # SOH check and track [TBD] - post-maneuver instrument operations USNAU_13M THEMIS_A 9.100 2008/287 18:05:00 2008/287 18:27:00 TR10 # Data dump - call USN to verify schedule - push new track file out prior to pass BGS_11M THEMIS_D 9.300 2008/288 03:39:40 2008/288 04:09:40 TR10 # Data dump BGS_11M THEMIS_E 9.200 2008/288 05:37:20 2008/288 06:07:20 TR10 # Data dump