=================================================================== Tohban report: 2009-04-21 to 2009-04-27 Produced at 10:00 on 2009-04-27 at Berkeley Checked data from: 2009-04-18/00:00 UT to 2009-04-25/23:59 UT =================================================================== Notes: 1. Apogee change maneuvers on TH-A, TH-D, and TH-E. 2. After the TH-A apogee raise maneuver on Monday (4/27), the spin rate will be ~19.75 rpm. Spin rate fine adjustment (19.7938 +/- 0.0130 rpm) will be delayed until Friday (5/01). This will result in a slightly increased 11-Hz noise on the FGM until the fine adjustment is performed. 3. Filter banks adjusted for dusk season on TH-D, TH-E. 4. Ground EFI distal braid for sensor shadow season on TH-B, TH-C. =================================================================== ICCRs Approved: 1. Delay the spin rate fine adjustment until Friday (5/1) - see above. 2. ICCR 086 Rev.1 -- Revised FB2/SCM1 passband settings on the inner probes. =================================================================== Data quality/collection status: TH-A FGM: full coverage ESA: full coverage except 01:35 UT 4/23 - 04:30 UT 4/24 and 00:00 UT 4/25 - 04:50 UT 4/25 SST: full coverage except 00:00 UT 4/25 - 04:55 UT 4/25 EFI: full coverage except 00:00 UT 4/25 - 05:05 UT 4/25 SCM: full coverage except 00:00 UT 4/25 - 05:05 UT 4/25 TH-B FGM: full coverage up to 03:10 UT 4/24 ESA: full coverage up to 07:10 UT 4/24 SST: full coverage up to 07:10 UT 4/24 EFI: full coverage up to 07:20 UT 4/24 SCM: full coverage up to 07:20 UT 4/24 TH-C FGM: full coverage ESA: full coverage SST: full coverage EFI: full coverage SCM: full coverage TH-D FGM: full coverage ESA: full coverage SST: full coverage EFI: full coverage SCM: full coverage TH-E FGM: full coverage ESA: full coverage SST: full coverage EFI: full coverage SCM: full coverage =================================================================== Instrument Ops (Highlights): #--------------------------------------------------------------------------------- # 2009/111 - 2009/112 Tuesday, April 21 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/111 16:39:50 2009/111 17:04:50 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/111 17:49:10 2009/111 18:14:10 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/112 02:17:00 2009/112 02:44:00 TR9 # Data dump - pre-maneuver table loads - blind acquisition BGS_11M THEMIS_A 9.100 2009/112 03:00:00 2009/112 03:45:00 TR8 # Data dump - blind acquisition BGS_11M THEMIS_C 9.400 2009/112 09:16:00 2009/112 09:52:00 TR9 # Data dump #--------------------------------------------------------------------------------- # 2009/112 - 2009/113 Wednesday, April 22 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/112 16:36:20 2009/112 17:01:20 TR10 # Data dump [DP] - configure filter bank for dusk season - ICCR_DOP86 BGS_11M THEMIS_E 9.200 2009/112 17:45:40 2009/112 18:10:40 TR10 # Data dump [DP] - configure filter bank for dusk season - ICCR_DOP86 DSS_54 THEMIS_B 2.992 2009/112 18:25:00 2009/112 18:55:00 TR2 # Ranging pass WHS_18M1 THEMIS_E 2.660 2009/112 18:27:00 2009/112 18:37:00 TR2 # SOH check and track - LRO proficiency test TDRS_3 THEMIS_A 9.100 2009/113 01:46:00 2009/113 01:55:30 TR2 # SOH check and track [ME] - pre-maneuver check-out - enable propulsion bus - hand-over to TDRS 5 TDRS_5 THEMIS_A 9.100 2009/113 01:56:00 2009/113 02:28:00 TR2 # ---> Apogee raise maneuver [ME] - P5 SM1B_D2 - MAN ID 271 - nominal burn BGS_11M THEMIS_A -9.100 2009/113 02:50:00 2009/113 03:48:00 TR9 # ---> Spin rate adjust maneuver [ME] - P5 - MAN ID 272 - target spin rate 19.7938 +/- 0.0130 rpm - nominal burn #--------------------------------------------------------------------------------- # 2009/113 - 2009/114 Thursday, April 23 #--------------------------------------------------------------------------------- DTF_21 THEMIS_B 2.992 2009/113 16:00:00 2009/113 23:00:00 TR2 # SLE testing - parallel data flow with THC DTF_21 THEMIS_C 2.992 2009/113 16:00:00 2009/113 23:00:00 TR2 # SLE testing - parallel data flow with THB BGS_11M THEMIS_D 9.300 2009/113 16:32:55 2009/113 16:57:55 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/113 17:42:15 2009/113 18:07:15 TR10 # Data dump WHS_18M1 THEMIS_E 2.660 2009/113 18:23:00 2009/113 18:32:00 TR2 # SOH check and track - LRO proficiency test HBK_10M THEMIS_E 2.660 2009/113 19:30:00 2009/113 19:50:00 TR2 # SOH check and track - HBK proficiency test - blind acquisition - negative acquisition - reason unknown - no data loss DSS_54 THEMIS_B 2.992 2009/113 23:20:00 2009/113 23:45:00 TR2 # Ranging pass DSS_65 THEMIS_C 2.891 2009/113 23:25:00 2009/113 23:45:00 TR2 # Ranging pass BGS_11M THEMIS_A 9.100 2009/114 04:20:00 2009/114 05:18:00 TR8 # Data dump BGS_11M THEMIS_B 9.500 2009/114 08:02:00 2009/114 08:50:00 TR19 # Data dump BGS_11M THEMIS_C 9.400 2009/114 08:55:00 2009/114 09:27:00 TR39 # Data dump #--------------------------------------------------------------------------------- # 2009/114 - 2009/115 Friday, April 24 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/114 16:29:25 2009/114 16:53:50 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/114 17:38:40 2009/114 18:03:40 TR10 # Data dump WHS_18M1 THEMIS_E 2.660 2009/114 18:19:00 2009/114 18:27:00 TR2 # SOH check and track - LRO proficiency test BGS_11M THEMIS_B 2.950 2009/114 20:42:15 2009/114 21:02:15 TR2 # SOH check and track [GL] - ground EFI distal braid for sensor shadow season - ICCR_DOP84 BGS_11M THEMIS_C 2.850 2009/114 22:05:30 2009/114 22:25:30 TR2 # SOH check and track [GL] - ground EFI distal braid for sensor shadow season - ICCR_DOP84 DSS_54 THEMIS_B 2.992 2009/114 22:35:00 2009/114 23:05:00 TR2 # Ranging pass BGS_11M THEMIS_E 2.660 2009/115 00:22:15 2009/115 00:42:15 TR2 # SOH check and track [ME] - configure filter bank to correct for spikes - ICCR_JSM87 USNAU_13M THEMIS_A 9.100 2009/115 04:37:00 2009/115 05:06:00 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/115 05:52:00 2009/115 06:50:00 TR7 # Data dump #--------------------------------------------------------------------------------- # 2009/115 - 2009/116 Saturday, April 25 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/115 16:25:50 2009/115 16:49:45 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/115 17:35:10 2009/115 18:00:10 TR10 # Data dump USNAU_13M THEMIS_A 9.100 2009/116 05:43:00 2009/116 06:12:00 TR10 # Data dump - call USN to confirm schedule BGS_11M THEMIS_C 9.400 2009/116 08:32:00 2009/116 09:01:00 TR9 # Data dump #--------------------------------------------------------------------------------- # 2009/116 - 2009/117 Sunday, April 26 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/116 16:22:10 2009/116 16:45:35 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/116 17:31:30 2009/116 17:56:00 TR10 # Data dump USNAU_13M THEMIS_A 9.100 2009/117 06:46:00 2009/117 07:11:00 TR10 # Data dump - call USN to verify schedule #--------------------------------------------------------------------------------- # 2009/117 - 2009/118 Monday, April 27 Week 18 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/117 16:11:35 2009/117 16:36:35 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/117 17:16:40 2009/117 17:41:40 TR10 # Data dump BGS_11M THEMIS_D 2.850 2009/117 23:35:00 2009/117 23:55:00 TR2 # SOH check and track [TBD] - pre-maneuver table loads BGS_11M THEMIS_E 9.100 2009/118 00:10:00 2009/118 00:30:00 TR2 # SOH check and track [TBD] - pre-maneuver table loads BGS_11M THEMIS_A 9.100 2009/118 03:20:00 2009/118 03:40:00 TR32 # SOH check and track [TBD] - pre-maneuver table loads BGS_11M THEMIS_D 9.100 2009/118 04:10:00 2009/118 05:05:00 TR12 # ---> Apogee change maneuver [TBD] - P3 SM2A_D2 - MAN ID 273 BGS_11M THEMIS_E 9.100 2009/118 05:10:00 2009/118 06:07:00 TR22 # ---> Apogee change maneuver [TBD] - P4 SM2A_D2 - MAN ID 274 TDRS_10 THEMIS_A 9.100 2009/118 07:01:00 2009/118 07:43:00 TR2 # ---> Apogee raise maneuver [TBD] - P5 SM1C_D2 - MAN ID 275 BGS_11M THEMIS_C 9.400 2009/118 07:38:00 2009/118 07:55:00 TR8 # Data dump BGS_11M THEMIS_B 9.400 2009/118 08:10:00 2009/118 08:40:00 TR10 # Data dump AGO_9M THEMIS_C 9.400 2009/118 08:30:00 2009/118 09:00:00 TR10 # Data dump USNAU_13M THEMIS_A 9.100 2009/118 08:36:00 2009/118 09:20:00 TR8 # Data dump - call USN to verify schedule