=================================================================== Tohban report: 2009-06-02 to 2009-06-08 Produced at 13:00 PST on 2009-06-08 (at UCB) Checked data from 2009-05-31/00:00 UT to 2009-06-06/24:00 UT Last available data A: 06-06 09:00 C: 06-05 15:00 D: 06-06 14:00 E: 06-06 14:00 =================================================================== Data quality/collection status =============================== FGM: A: full data coverage except for 06-04 with many gaps (data dump problem) B: full data coverage C: full data coverage D: full data coverage E: full data coverage ESA: A: full data coverage except for 06-04 with many gaps (data dump problem) B: full data coverage C: full data coverage D: full data coverage E: full data coverage SST: A: full data coverage except for 06-04 with many gaps (data dump problem) B: full data coverage C: full data coverage D: full data coverage E: full data coverage EFI filter bank data: A: full data coverage B: full data coverage C: full data coverage D: full data coverage E: full data coverage SCM filter bank data: A: full data coverage B: full data coverage C: full data coverage D: full data coverage E: full data coverage ================================================================================== Instrument Ops (Highlights and I really mean only highlights) #--------------------------------------------------------------------------------- # 2009/151 - 2009/152 Sunday, May 31 #--------------------------------------------------------------------------------- #--------------------------------------------------------------------------------- # 2009/152 - 2009/153 Monday, June 1 Week 23 #--------------------------------------------------------------------------------- #--------------------------------------------------------------------------------- # 2009/153 - 2009/154 Tuesday, June 2 #--------------------------------------------------------------------------------- #--------------------------------------------------------------------------------- # 2009/154 - 2009/155 Wednesday, June 3 #--------------------------------------------------------------------------------- BGS_11M THEMIS_B 2.950 2009/155 00:01:20 2009/155 00:21:20 TR2 # configure EFI wave burst collection (APID 0x44B, 16 ksps EAC) for radbelt campaign - ICCR_DOP88 BGS_11M THEMIS_C 2.850 2009/155 00:50:30 2009/155 01:10:30 TR2 # configure EFI wave burst collection (APID 0x44B, 16 ksps EAC) for radbelt campaign - ICCR_DOP88 USNAU_13M THEMIS_A 9.100 2009/155 03:17:00 2009/155 03:47:00 TR10 # configure EFI wave burst collection (APID 0x44B, 16 ksps EAC) for radbelt campaign - ICCR_DOP88 #--------------------------------------------------------------------------------- # 2009/155 - 2009/156 Thursday, June 4 #--------------------------------------------------------------------------------- MILA_9M2 THEMIS_A 2.560 2009/155 20:10:00 2009/155 20:30:00 TR2 # adjust scale for spacecraft potential calculation to 230 (0xE6) - ICCR_MML28 BGS_11M THEMIS_B 2.950 2009/155 20:51:40 2009/155 21:11:40 TR2 # pre-maneuver table loads BGS_11M THEMIS_C 2.850 2009/155 22:05:00 2009/155 22:25:00 TR2 # pre-maneuver table loads BGS_11M THEMIS_A 9.100 2009/156 03:57:00 2009/156 04:55:00 TR8 # Data dump - lost 1992 of 8385 VC1 and 13476 of 63937 VC3 frames - antenna aspect angle 100-106 deg - SCM boom obstruction BGS_11M THEMIS_A 9.100 2009/156 05:14:30 2009/156 05:29:00 TR9 # Data dump - no errors - antenna aspect angle 108.3-108.8 deg #--------------------------------------------------------------------------------- # 2009/156 - 2009/157 Friday, June 5 #--------------------------------------------------------------------------------- USNAU_13M THEMIS_C 9.400 2009/156 14:37:00 2009/156 15:12:00 TR10 # pre-maneuver check-out - enable propulsion bus TDRS_5 THEMIS_C 9.100 2009/156 15:15:00 2009/156 15:42:00 TR2 # ---> Apogee drop maneuver [JM] - P2 SM03_D2 - MAN ID 292 - nominal burn BGS_11M THEMIS_C 9.400 2009/156 15:43:00 2009/156 16:34:00 TR8 # ---> Attitude precession maneuver to science south [JM] - P2 - MAN ID 293 - nominal burn - # spin rate adjust maneuver - P2 - MAN ID 294 - target spin rate 20.2105 +/- 0.0130 rpm - nominal burn BGS_11M THEMIS_C 2.850 2009/156 19:00:00 2009/156 19:58:40 TR2 # post-maneuver instrument operations #--------------------------------------------------------------------------------- # 2009/157 - 2009/158 Saturday, June 6 #---------------------------------------------------------------------------------