=================================================================== Tohban report: 2009-06-23 to 2009-06-29 Produced at 3:30 MST on 2009-06-29 (at LASP by S. Eriksson) Checked data from 2009-06-19/00:00 UT to 2009-06-27/24:00 UT =================================================================== TH-A NOTE 1: HBK DSN FAILED TO SCHEDULE PASS 2009/172 05:49:00 to 05:56:00. 14 HOUR DATA LOSS (2009-06-21/18:00 to 2009-06-22/08:00 UT) AS A RESULT. NOTE 2: USNHI DATA DUMP 2009/179 03:06:00 to 03:21:00 (06-28) ONLY 15 MIN. SOME SURVEY DATA RECOVERED. 17 HOUR DATA LOSS (2009-06-28/11:30 to 2009-06-29/04:20 UT). TH-B NOTE 1: 2009-06-25/09:05-09:25 UT (hardwired fast survey configured for solar wind) NOTE 2: Next dump BGS 2009/182 05:41:00 TH-C NOTE 1: 2009-06-24/05:50-06:10 UT (hardwired fast survey configured for solar wind) NOTE 2: Last dump BGS 2009/180 10:54:25 VC3 apid 454 range 06-27/10:34 to 06-29/09:44 UT NOTE 3: Next dump BGS 2009/182 10:31:25 TH-D NOTE 1: Fast survey interval 2009-06-24/06:20-09:02 UT improperly configured due to TH-D ETC kicker at 2009/175 01:51 UTC Data quality/collection status ============================== FGM: apids 460-461 A: 06/19-06/27 full data coverage B: 06/19-06/27 full data coverage C: 06/19-06/27 full data coverage D: 06/19-06/27 full data coverage E: 06/19-06/27 full data coverage ESA: apids 454-459 A: 06/19-06/27 full data coverage except: 2009-06-21/18:00-24:00 UT (memory saturated due to failed HBK DSN 2009/172 05:49:00) 2009-06-22/00:00-08:30 UT (memory saturated due to failed HBK DSN 2009/172 05:49:00) 2009-06-23/10:00-12:30 UT (memory saturated) 2009-06-25/17:30-19:45 UT (memory saturated) B: 06/19-06/27 full data coverage except: 2009-06-19/04:30-10:00 UT (memory saturated) 2009-06-23/03:30-09:00 UT (memory saturated) 2009-06-27/03:00-08:30 UT (memory saturated) C: 06/19-06/27 full data coverage except: 2009-06-23/10:40-11:05 UT (PEER apid 458 data gap - possibly missing frames from AGO 2009/174 12:35:00 VC3 file) D: 06/19-06/27 full data coverage E: 06/19-06/27 full data coverage SST: apids 45a-f A: 06/19-06/27 full data coverage except: 2009-06-21/21:00-24:00 UT (memory saturated due to failed HBK DSN 2009/172 05:49:00) 2009-06-22/00:00-08:30 UT (memory saturated due to failed HBK DSN 2009/172 05:49:00) 2009-06-22/08:30-12:30 UT (missing apid 45b in VC3 files dumped BGS 2009/173 08:11:25 and BGS 2009/174 12:20:00) B: 06/19-06/27 full data coverage except: 2009-06-27/03:00-08:30 UT (memory saturated) C: 06/19-06/27 full data coverage D: 06/19-06/27 full data coverage E: 06/19-06/27 full data coverage EFI filter bank: A: 06/19-06/27 full data coverage except: 2009-06-21/18:30-24:00 UT (memory saturated due to failed HBK DSN) 2009-06-22/00:00-09:00 UT (memory saturated due to failed HBK DSN) 2009-06-23/10:00-12:30 UT (memory saturated) 2009-06-25/17:30-19:45 UT (memory saturated) B: 06/19-06/27 full data coverage except: 2009-06-19/04:30-10:00 UT (memory saturated) 2009-06-23/03:30-09:00 UT (memory saturated) C: 06/19-06/27 full data coverage D: 06/19-06/27 full data coverage E: 06/19-06/27 full data coverage SCM filter bank: A: 06/19-06/27 full data coverage except: 2009-06-21/18:30-24:00 UT (memory saturated due to failed HBK DSN) 2009-06-22/00:00-09:00 UT (memory saturated due to failed HBK DSN) 2009-06-23/10:00-12:30 UT (memory saturated) 2009-06-25/17:30-19:45 UT (memory saturated) B: 06/19-06/27 full data coverage except: 2009-06-19/04:30-10:00 UT (memory saturated) 2009-06-23/03:30-09:00 UT (memory saturated) C: 06/19-06/27 full data coverage D: 06/19-06/27 full data coverage E: 06/19-06/27 full data coverage ================================= Instrument Ops (Highlights) #--------------------------------------------------------------------------------- # 2009/171 - 2009/172 Saturday, June 20 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/171 12:59:45 2009/171 13:30:30 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/171 14:01:15 2009/171 14:36:10 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/172 04:36:45 2009/172 05:01:00 TR9 # Data dump HBK_10M THEMIS_A 9.100 2009/172 05:49:00 2009/172 05:56:00 TR9 # Data dump - negative acquisition - station forgot to schedule the pass - all data remain onboard #--------------------------------------------------------------------------------- # 2009/172 - 2009/173 Sunday, June 21 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 9.400 2009/172 12:23:55 2009/172 12:44:25 TR20 # Data dump BGS_11M THEMIS_D 9.300 2009/172 12:56:00 2009/172 13:26:00 TR40 # Data dump AGO_9M THEMIS_C 9.400 2009/172 13:00:00 2009/172 13:15:00 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/172 13:57:30 2009/172 14:32:25 TR10 # Data dump DSS_27 THEMIS_C 2.895 2009/173 04:10:00 2009/173 04:55:00 TR2 # Ranging pass BGS_11M THEMIS_A 9.100 2009/173 08:11:10 2009/173 08:40:35 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/173 - 2009/174 Monday, June 22 Week 26 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/173 12:52:15 2009/173 13:23:00 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/173 13:53:40 2009/173 14:28:35 TR10 # Data dump WLP_11M THEMIS_E 9.000 2009/173 14:45:00 2009/173 15:15:00 TR8 # Data dump [MB] - engineering support to test new ACU software - propagator still needs fixes - autotrack worked fine AGO_9M THEMIS_E 2.680 2009/173 15:20:00 2009/173 15:35:00 TR2 # SOH check and track - negative acquisition - ITOS turn-around time from WLP pass too short - data collected at station BGS_11M THEMIS_B 9.500 2009/174 08:57:50 2009/174 09:20:15 TR10 # Data dump BGS_11M THEMIS_C 9.400 2009/174 11:58:50 2009/174 12:15:00 TR20 # Data dump #--------------------------------------------------------------------------------- # 2009/174 - 2009/175 Tuesday, June 23 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.400 2009/174 12:20:00 2009/174 12:33:00 TR40 # Data dump AGO_9M THEMIS_C 9.400 2009/174 12:35:00 2009/174 12:51:00 TR10 # Data dump MILA_9M2 THEMIS_A 9.100 2009/174 12:45:00 2009/174 13:00:00 TR10 # Data dump BGS_11M THEMIS_D 9.300 2009/174 12:48:25 2009/174 13:19:10 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/174 13:49:45 2009/174 14:24:40 TR10 # Data dump DSS_27 THEMIS_B 2.660 2009/175 01:15:00 2009/175 01:45:00 TR2 # Ranging pass BGS_11M THEMIS_D 2.760 2009/175 09:00:20 2009/175 09:20:20 TR2 # SOH check and track [ME] - reset hung-up ETC chip - ran IDPU scripts 0x4B and 0x39 to configure ETC for fast survey #--------------------------------------------------------------------------------- # 2009/175 - 2009/176 Wednesday, June 24 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/175 12:44:35 2009/175 13:15:20 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/175 13:45:55 2009/175 14:20:45 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/175 15:44:55 2009/175 16:19:55 TR10 # Data dump DSS_27 THEMIS_B 2.660 2009/175 20:35:00 2009/175 20:55:00 TR2 # Ranging pass DSS_27 THEMIS_B 2.995 2009/176 02:45:00 2009/176 03:45:00 TR2 # Ranging pass DSS_24 THEMIS_C 2.896 2009/176 05:45:00 2009/176 06:40:00 TR2 # Ranging pass BGS_11M THEMIS_C 9.400 2009/176 11:35:20 2009/176 11:54:40 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/176 - 2009/177 Thursday, June 25 #--------------------------------------------------------------------------------- AGO_9M THEMIS_C 9.400 2009/176 12:10:00 2009/176 12:28:00 TR10 # Data dump BGS_11M THEMIS_D 9.300 2009/176 12:40:50 2009/176 13:11:30 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/176 13:42:05 2009/176 14:16:50 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/176 19:27:40 2009/176 19:52:00 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/177 - 2009/178 Friday, June 26 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/177 12:37:15 2009/177 13:07:50 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/177 13:38:25 2009/177 14:13:05 TR10 # Data dump TDRS_3 THEMIS_A 9.100 2009/177 22:20:00 2009/177 22:30:00 TR2 # Proficiency pass [JM] - test SN scheduling via SNAS - blind acquisition USNHI_13M THEMIS_A 9.100 2009/177 22:57:00 2009/177 23:30:00 TR10 # Data dump BGS_11M THEMIS_A 9.200 2009/177 23:42:00 2009/178 00:39:00 TR8 # Data dump DSS_34 THEMIS_C 2.894 2009/178 02:55:00 2009/178 03:55:00 TR2 # Ranging pass BGS_11M THEMIS_B 9.500 2009/178 08:15:00 2009/178 08:36:00 TR10 # Data dump HBK_10M THEMIS_B 2.660 2009/178 09:19:00 2009/178 09:30:00 TR9 # Data dump BGS_11M THEMIS_C 9.400 2009/178 11:15:00 2009/178 11:33:25 TR10 # Data dump AGO_9M THEMIS_C 9.400 2009/178 11:50:00 2009/178 12:08:00 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/178 - 2009/179 Saturday, June 27 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/178 12:33:40 2009/178 13:04:10 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/178 13:34:50 2009/178 14:09:25 TR10 # Data dump DSS_54 THEMIS_B 2.895 2009/178 19:05:00 2009/178 19:35:00 TR2 # Ranging pass USNHI_13M THEMIS_A 9.100 2009/179 03:06:00 2009/179 03:21:00 TR9 # Data dump #--------------------------------------------------------------------------------- # 2009/179 - 2009/180 Sunday, June 28 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/179 12:30:15 2009/179 13:00:45 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/179 13:31:20 2009/179 14:05:50 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/180 04:18:00 2009/180 04:47:00 TR9 # Data dump DSS_27 THEMIS_C 2.895 2009/180 04:25:00 2009/180 05:25:00 TR2 # Ranging pass HBK_10M THEMIS_A 9.100 2009/180 05:40:00 2009/180 06:00:00 TR9 # Data dump - blind acquisition BGS_11M THEMIS_C 9.400 2009/180 10:54:25 2009/180 11:12:30 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/180 - 2009/181 Monday, June 29 Week 27 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2009/180 12:26:45 2009/180 12:57:15 TR10 # Data dump WLP_11M THEMIS_D 9.000 2009/180 13:15:00 2009/180 13:45:00 TR9 # Data dump - engineering support to test new ACU software BGS_11M THEMIS_E 9.200 2009/180 13:27:50 2009/180 14:02:15 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/181 07:54:10 2009/181 08:22:50 TR10 # Data dump ======= Science ======= (1) TH-C: magnetopause surface wave activity 2009-06-21/18:30-20:00 UT - TH-B in solar wind (2) TH-A (D,E): Extended magnetopause surface wave active period during southward IMF (TH-B,C in solar wind) TH-A 2009-06-23/20:30 to 2009-06-24/06:30 UT interrupted by a few magnetosheath periods Unfortunately, TH-A in slow survey. (3) TH-C: Long duration bow shock encounter 2009-06-26/00-10 UT