=================================================================== Tohban report: 2009-10-06 to 2009-10-12 Produced at 12:20 on 2009-10-12 (at Berkeley by Jonathan Eastwood) Checked data from: 2009-10-05/00:00 UT to 2009-10-11/23:59 UT =================================================================== Summary: 1. Inner probe data appear ok, except peculiar interval: FGM on TH-A P5, 10/07 2350UT - 10/08 0950UT, fgs data only available periodically? 2. Outer probe data P1 ok, P2 missing data for almost 1 orbit? 10/5 - 10/9 L0 data packets appear to be present? =================================================================== ICCRs Approved: No ICCRs approved, but previous activity completed: 2009/279, 18:57 UT: DBRAID on TH-C restored to V1-driven (nominal) state as the sun angle had reached -3.31 degrees. =================================================================== Data quality/collection status 2009-10-05/00:00 UT to 2009-10-11/23:59 UT: ------------------------------------------------------------------- (P1) TH-B FGM: full coverage ESA: full coverage except 10/09 1255 UT - 2400 UT SST: full coverage except 10/09 0000 UT - 2400 UT EFI fields + filter bank: full coverage SCM fields + filter bank: full coverage (P2) TH-C FGM: full coverage except 10/05 1815 UT - 10/09 1140 UT ESA: full coverage except 10/05 2215 UT - 10/09 1450 UT SST: full coverage except 10/05 2225 UT - 10/09 1505 UT EFI fields + filter bank: full coverage except 10/05 2235 UT - 10/09 1520 UT SCM fields + filter bank: full coverage except 10/05 2235 UT - 10/09 1520 UT ------------------------------------------------------------------- (P5) TH-A FGM: full coverage except 10/07 2350UT - 10/08 0950UT, fgs data only available periodically? ESA: full coverage except 10/10 2105UT - 10/11 0100UT SST: full coverage except 10/10 2105UT - 10/11 0105UT EFI fields + filter bank: full coverage except 10/10 2135UT - 10/11 0120UT SCM fields + filter bank: full coverage except 10/10 2135UT - 10/11 0120UT (P3) TH-D FGM: full coverage ESA: full coverage SST: full coverage EFI fields + filter bank: full coverage SCM fields + filter bank: full coverage (P4) TH-E FGM: full coverage ESA: full coverage SST: full coverage EFI fields + filter bank: full coverage SCM fields + filter bank: full coverage =================================================================== Instrument Ops (Highlights): #--------------------------------------------------------------------------------- # 2009/279 - 2009/280 Tuesday, October 6 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2009/279 12:14:40 2009/279 12:46:50 TR10 # Data dump MILA_9M2 THEMIS_C 2.690 2009/279 17:00:00 2009/279 17:30:00 TR2 # SOH check and track [JM] - post-maneuver instrument operations BGS_11M THEMIS_C 2.850 2009/279 18:00:00 2009/279 18:40:00 TR12 # SOH check and track [JM] - restored EFI distal braid grounding to normal configuration - ICCR_JSM95 DSS_65 THEMIS_B 9.500 2009/280 04:00:00 2009/280 05:15:00 TR6 # Data dump and track BGS_11M THEMIS_D 9.300 2009/280 06:16:05 2009/280 06:45:50 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/280 07:15:15 2009/280 07:46:05 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/280 - 2009/281 Wednesday, October 7 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 2.560 2009/280 16:25:25 2009/280 17:23:00 TR8 # Data dump BGS_11M THEMIS_D 9.300 2009/281 06:12:20 2009/281 06:42:10 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/281 07:11:25 2009/281 07:42:20 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/281 - 2009/282 Thursday, October 8 #--------------------------------------------------------------------------------- MILA_9M2 THEMIS_A 9.000 2009/281 14:10:00 2009/281 16:05:00 TR6 # Data dump - advise station transmitter off/on at 60 minutes WLP_11M THEMIS_A 9.100 2009/281 17:10:00 2009/281 18:03:00 TR7 # Data dump DSS_24 THEMIS_C 9.400 2009/281 18:45:00 2009/281 20:50:00 TR7 # Data dump and track USNHI_13M THEMIS_A 9.900 2009/281 19:45:00 2009/281 20:15:00 TR9 # Data dump BGS_11M THEMIS_D 9.300 2009/282 06:08:30 2009/282 06:38:20 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/282 07:07:35 2009/282 07:38:35 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/282 - 2009/283 Friday, October 9 #--------------------------------------------------------------------------------- DSS_24 THEMIS_B 9.500 2009/282 13:35:00 2009/282 15:05:00 TR7 # Data dump and track - missed 684 out of 14445 VC1 and VC3 frames (4.7%) - range 305,000 km HBK_10M THEMIS_C 9.400 2009/282 16:19:00 2009/282 16:39:00 TR10 # Data dump [JT] - intermittent telemetry lock during first half of the pass BGS_11M THEMIS_C 2.850 2009/282 18:19:00 2009/282 18:47:00 TR6 # Data dump [JT] MILA_9M2 THEMIS_A 9.000 2009/282 21:27:00 2009/282 21:51:00 TR9 # Data dump BGS_11M THEMIS_D 9.300 2009/283 06:04:35 2009/283 06:34:30 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/283 07:03:45 2009/283 07:34:40 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/283 - 2009/284 Saturday, October 10 #--------------------------------------------------------------------------------- BGS_11M THEMIS_A 9.100 2009/284 00:53:05 2009/284 01:11:45 TR10 # Data dump DSS_65 THEMIS_C 9.400 2009/284 04:40:00 2009/284 06:25:00 TR7 # Data dump and track BGS_11M THEMIS_D 9.300 2009/284 06:00:40 2009/284 06:30:35 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/284 06:59:50 2009/284 07:30:45 TR10 # Data dump #--------------------------------------------------------------------------------- # 2009/284 - 2009/285 Sunday, October 11 #--------------------------------------------------------------------------------- BGS_11M THEMIS_B 2.950 2009/284 23:05:50 2009/284 23:50:00 TR2 # SOH check and track [JM] - pre-maneuver table load - pre-maneuver check-out - enable propulsion bus BGS_11M THEMIS_A 9.100 2009/285 04:22:00 2009/285 04:40:45 TR10 # Data dump WLP_11M THEMIS_A 2.000 2009/285 04:56:00 2009/285 05:13:00 TR10 # Data dump DSS_54 THEMIS_C 9.400 2009/285 05:25:00 2009/285 07:20:00 TR6 # Data dump and track BGS_11M THEMIS_D 9.300 2009/285 05:56:40 2009/285 06:26:35 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/285 06:55:45 2009/285 07:26:50 TR10 # Data dump USNHI_13M THEMIS_B 9.900 2009/285 07:30:00 2009/285 08:00:00 TR2 # SOH check and track [JT] - back-up pre-maneuver check-out - enable propulsion bus USNAU_13M THEMIS_B 9.900 2009/285 08:25:00 2009/285 08:55:00 TR9 # ---> Flyby targeting maneuver [JT] - P1 FTM 1 - axial burn - MAN ID 334 - side-thrust burn - MAN ID 335 - nominal burns BGS_11M THEMIS_B 9.500 2009/285 09:26:25 2009/285 10:00:40 TR9 # Data dump [JT] - post-maneuver VC1 and VC4 dump - post-maneuver instrument operations (after 09:45:00) DSS_27 THEMIS_B 2.991 2009/285 10:15:00 2009/285 12:15:00 TR6 # Data dump #--------------------------------------------------------------------------------- # 2009/285 - 2009/286 Monday, October 12 Week 42 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 9.900 2009/285 23:45:00 2009/286 00:15:00 TR2 # SOH check and track [TBD] - pre-maneuver table load - pre-maneuver check-out - enable propulsion bus DSS_65 THEMIS_B 9.500 2009/286 04:45:00 2009/286 05:45:00 TR6 # Data dump and track BGS_11M THEMIS_D 9.300 2009/286 05:52:45 2009/286 06:22:40 TR10 # Data dump BGS_11M THEMIS_E 9.200 2009/286 06:51:55 2009/286 07:22:55 TR10 # Data dump BGS_11M THEMIS_A 9.100 2009/286 08:14:20 2009/286 08:45:35 TR10 # Data dump USNAU_13M THEMIS_C 9.900 2009/286 08:25:00 2009/286 08:55:00 TR9 # Data dump [TBD] - back-up pre-maneuver check-out - enable propulsion bus TDRS_7 THEMIS_C -9.900 2009/286 09:17:00 2009/286 09:51:00 TR2 # ---> Apogee raise maneuver [TBD] - P2 ORM 16A - MAN ID 336 BGS_11M THEMIS_C 9.900 2009/286 10:05:00 2009/286 10:31:00 TR9 # Data dump [TBD] - post-maneuver VC1 and VC4 dump BGS_11M THEMIS_C 9.900 2009/286 10:46:00 2009/286 11:12:00 TR8 # Data dump [TBD]