IDPU/Instrument Status Board

The current time is 06:36:14 114/24 GMT

Current flight s/w version is 2.9 operating out of RAM.
EEPROMs contain flight s/w versions...
EEPROM Number Flight Software Version
1 2.7
2 2.6
3 2.5
4 2.7
Active s/w Patch Procedures...
FIRAMLOAD(F97011ILMLOD.02,2.9) FIDPULOAD(F97205ILMLOD.05)
Nominal power setting is 3.
BURST MEMORY
The # of burst segments is 5.
The data ratio is 64.
FAST SURVEY MEMORY
The trigger decay value is 1.
The current modes are...
Field Mode
FILENAME
Field Mode
SLOT #
Field Mode
ID #
Particle Mode
FILENAME
Particle Mode
SLOT #
Particle Mode
ID #
F01260ILF224.05 F0 224 F02148ILP037.00 P0 037
F01260ILF225.05 F1 225 F97118ILP033.00 P1 033
F99347ILF044.05 F2 044 F98169ILP036.00 P2 036
F99347ILF045.05 F3 045 F02260ILP038.00 P3 038
F00262ILF200.05 F4 200 F97015ILP022.00 P4 022
F00262ILF201.05 F5 201 F98154ILP035.01 P5 035
F01208ILF254.05 F6 254 F97041ILP031.00 P6 031
F98218ILF255.08 F7 255 F95082ILP255.04 P7 255

    IDPU
  • Present Status: Nominal Operations
  • History: On since initial turn-on, 08/21/96. Reset performed on 09/18/96.
  • Problems: none
Health and Safety Data

    ESA(s)
  • Present Status: All stacks operational w/HV on.
  • History: Initial low voltage checkouts on 08/30/96 and 09/12/96 with the covers opened on 09/12/96 also. High voltage turn-on began on 09/16/96 with stack 1 and finished on 9/17/96 with all stacks reaching maximum voltage. On 10 September 1997 the MCP voltages were updated.
  • Problems: none
Health and Safety Data

    TEAMS
  • Present Status: Nominal Operations
  • History: Low voltage turn-on on 09/13/96, followed by the release. High voltage turn-on activities began on 09/18/96. TEAMS MCP voltage increases on: September 18, 1997 (hex AD) on orbit 4255; October 3, 1997 (hex B0) on orbit 4415; and October 10, 1997 (hex B3) on orbit 4492.
  • Problems: none
Current TEAMS look-up Tables, loaded on 18 May 1997...
F94093MEMLOD.01
F94093MEMLOD.02
F94093MEMLOD.07 (20kV)

Health and Safety Data

    FIELDS
  • Present Status: Nominal Operations
  • History: Three wire booms and upper axial boom deployed.
  • Problems: None
  • Boom Status: Nominal Operations
Health and Safety Data