March 18, 2000: 1. A final look at the IMAGE satellite shortly before
launch. This side shows GEO and SI and WIC (from left).
March 18, 2000: 2. A final look at the IMAGE satellite shortly before
launch
March 18, 2000: 3. A final look at the IMAGE satellite shortly before
launch
March 17, 2000: A final look at WIC shortly before launch
March 17, 2000: A final look at SI shortly before launch
March 17, 2000: A final look at GEO shortly before launch
March 17, 2000: 1. The WIC after removal of all red tag items
March 17, 2000: 2. The WIC after removal of all red tag items
March 17, 2000: 1. The SI after removal of all red tag items
March 17, 2000: 2. The SI after removal of all red tag items
March 17, 2000: 3. The SI after removal of all red tag items
March 17, 2000: 4. The SI after removal of all red tag items
March 17, 2000: 1. The GEO after removal of all red tag items
March 17, 2000: 2. The GEO after removal of all red tag items
March 17, 2000: 3. The GEO after removal of all red tag items
January 26, 99:
The instrument deck at SwRI after integration of FUV
January 26, 99: The
last screw has to be tightened
January 26, 99: The
instrument integration of FUV
January 26, 99:
Clean room work
January 26, 99:
Moving SI
January 26, 99:
Guess who is that!
January 26, 99: The
PI in a hurry
January 26, 99:
The instrument deck at SwRI before integration of FUV
- December 1, 1998:
Images of SI and MENA
July 6, 98: Fully
assembled WIC
May 18, 98: Latest
views of SI
May 18, 98: Latest
views of SI
May 18, 98: Latest
views of SI
Apr 30, 98:
The back imager of SI
Apr 30, 98:
Another view of the back imager
Apr 30, 98:
The collimator of SI
Apr 30, 98:
Front view of SI detector
Apr 30, 98:
Rear view of SI detector
Apr 30, 98:
The open shaker
Apr 30, 98:
SI and the shaker
Apr 30, 98: SI
integration
Apr 30, 98: The
shaker
Apr 30, 98: View
of the open SI
Mar 03, 98: Front
door of SI
Mar 03, 98: SI
Instrument
Mar 03, 98: SI
Instrument
Feb 20, 98: High
voltage power supply
Feb 10, 98: Test
vacuum chamber at CSL
Feb 05, 98: SI back-imager
test
Feb 03, 98: SI during
integration
Jan 18, 98: Prototype
of GEO detector
Jan 18, 98:
Program manager H. Heetderks at work
Jan 18, 98: One
of the SI proto-detectors