=================================================================== Tohban report: 2010-02-23 to 2010-03-01 Produced at 13:00 PST on 2010-03-01 (at UCLA) by Xuzhi Zhou Checked data from: 2010-02-21/00:00 UT to 2010-02-27/24:00 UT =================================================================== ICCR approved: ICCR_JSM104 -- implements the compression decimation algorithm on THEMIS-B. ================================================================== Notes: 1. Tail #3 science collection scheme implemented on 02/24/2010: One 11-hour FS conjunction interval for all inner probes: 23:30 - 10:30 UT. Burst Mode: Particle Burst trigger set to Bz, Wave Burst trigger set to Filter Banks. 2. THEMIS-B was turned to Solar Wind mode on 02/24/2010. =================================================================== Data quality/collection status ============= FGM: A: 02/21-02/27: full data coverage B: 02/21-02/27: NO DATA, except 00:15 02/25 - 03:15 02/26 C: 02/21-02/27: full data coverage D: 02/21-02/27: full data coverage E: 02/21-02/27: full data coverage ESA: A: 02/21-02/27: full data coverage B: 02/21-02/27: NO DATA, except 00:15 - 04:15 02/25 C: 02/21-02/27: full data coverage, except 08:00 - 19:00 02/26 due to maneuver D: 02/21-02/27: full data coverage E: 02/21-02/27: full data coverage, except 20:30 - 23:00 02/27 due to maneuver SST: A: 02/21-02/27: full data coverage B: 02/21-02/27: NO DATA, except 00:15 - 04:15 02/25 C: 02/21-02/27: full data coverage D: 02/21-02/27: full data coverage E: 02/21-02/27: full data coverage, except 20:30 - 22:00 02/27 due to maneuver EFI filter bank data A: 02/21-02/27: full data coverage B: 02/21-02/27: NO DATA, except 00:15 - 04:15 02/25 C: 02/21-02/27: full data coverage D: 02/21-02/27: full data coverage E: 02/21-02/27: full data coverage SCM filter bank data A: 02/21-02/27: full data coverage B: 02/21-02/27: NO DATA, except 00:15 - 04:15 02/25 C: 02/21-02/27: full data coverage D: 02/21-02/27: full data coverage E: 02/21-02/27: full data coverage ================================= Instrument Ops (Highlights) #--------------------------------------------------------------------------------- # 2010/052 - 2010/053 Sunday, February 21 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2010/052 17:34:45 2010/052 18:11:55 TR7 # Data dump BGS_11M THEMIS_A 9.100 2010/052 20:46:55 2010/052 20:57:55 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/052 21:12:55 2010/052 21:34:00 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/052 21:41:05 2010/052 21:58:55 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/052 22:03:55 2010/052 22:23:55 TR40 # Data dump BGS_11M THEMIS_B -2.500 2010/053 01:40:00 2010/053 02:30:00 TR1 # CW track - blind acq - range 825,000 km - 100 W uplink power - BGS at PM 100 Hz LBW - AGC level 36.4 dB - solid RF lock #--------------------------------------------------------------------------------- # 2010/053 - 2010/054 Monday, February 22 Week 8 #--------------------------------------------------------------------------------- DSS_65 THEMIS_B 9.500 2010/053 16:20:00 2010/053 18:20:00 TR3 # SOH check and track [TBD] - upload new ATS table BGS_11M THEMIS_D 9.300 2010/053 17:31:00 2010/053 18:08:00 TR7 # Data dump BGS_11M THEMIS_A 9.100 2010/053 20:44:00 2010/053 20:55:00 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/053 21:09:25 2010/053 21:30:25 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/053 21:37:25 2010/053 21:55:15 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/053 22:00:15 2010/053 22:20:15 TR40 # Data dump DSS_65 THEMIS_C 9.400 2010/054 00:45:00 2010/054 02:30:00 TR6 # Data dump and track BGS_11M THEMIS_B -2.500 2010/054 01:40:00 2010/054 02:30:00 TR1 # CW track - blind acq - range 860,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 34.7 dB - # solid two-way RF lock with 100 W uplink and modulation off DSS_24 THEMIS_C 9.400 2010/054 07:50:00 2010/054 09:45:00 TR6 # Data dump and track #--------------------------------------------------------------------------------- # 2010/054 - 2010/055 Tuesday, February 23 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2010/054 17:26:55 2010/054 18:04:50 TR7 # Data dump BGS_11M THEMIS_A 9.100 2010/054 20:39:40 2010/054 20:50:40 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/054 21:05:40 2010/054 21:26:40 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/054 21:33:45 2010/054 21:51:35 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/054 21:56:35 2010/054 22:16:35 TR40 # Data dump BGS_11M THEMIS_B -2.500 2010/055 00:20:00 2010/055 01:10:00 TR1 # CW track - range 890,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 34.7 dB - # solid two-way RF lock with 100 W uplink and modulation off DSS_24 THEMIS_B 9.500 2010/055 01:35:00 2010/055 02:55:00 TR4 # Data dump and track #--------------------------------------------------------------------------------- # 2010/055 - 2010/056 Wednesday, February 24 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2010/055 17:23:05 2010/055 18:01:20 TR7 # Data dump DSS_54 THEMIS_B 9.500 2010/055 18:15:00 2010/055 19:45:00 TR4 # SOH check and track [JM] - loaded HSK filter table and science data decimation for deep-space regime - ICCR_JSM104 BGS_11M THEMIS_A 9.100 2010/055 20:35:50 2010/055 20:46:55 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/055 21:01:55 2010/055 21:22:55 TR20 # Data dump [JM] - configured science data acquisition for tail season 3 - ICCR_DOP105 BGS_11M THEMIS_D 9.300 2010/055 21:30:00 2010/055 21:47:45 TR30 # Data dump [JM] - configured science data acquisition for tail season 3 - ICCR_DOP105 BGS_11M THEMIS_E 9.200 2010/055 21:52:45 2010/055 22:12:45 TR40 # Data dump [JM] - configured science data acquisition for tail season 3 - ICCR_DOP105 BGS_11M THEMIS_B -2.500 2010/055 22:55:00 2010/055 23:45:00 TR1 # CW track - range 917,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 36.4 dB - # solid two-way RF lock with 100 W uplink and modulation off DSS_45 THEMIS_B 9.500 2010/056 00:00:00 2010/056 01:00:00 TR3 # SOH check and track [JM] - cleared filled-up SSR - started to acquire new science data with deep-space decimation DSS_54 THEMIS_C 9.400 2010/056 02:55:00 2010/056 06:25:00 TR6 # Data dump and track #--------------------------------------------------------------------------------- # 2010/056 - 2010/057 Thursday, February 25 #--------------------------------------------------------------------------------- BGS_11M THEMIS_C 2.850 2010/056 15:28:35 2010/056 16:00:05 TR2 # SOH check and track [JT] - pre-maneuver table load and check-out - enable propulsion bus BGS_11M THEMIS_D 9.300 2010/056 17:19:15 2010/056 17:57:10 TR7 # Data dump BGS_11M THEMIS_A 9.100 2010/056 20:31:55 2010/056 20:43:10 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/056 20:58:10 2010/056 21:19:05 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/056 21:26:15 2010/056 21:43:55 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/056 21:48:55 2010/056 22:08:55 TR40 # Data dump BGS_11M THEMIS_B -2.500 2010/056 22:55:00 2010/056 23:45:00 TR1 # CW track - range 945,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 36.7 dB - # solid two-way RF lock with 100 W uplink and modulation off TDRS_10 THEMIS_C -9.400 2010/057 07:26:55 2010/057 07:36:55 TR2 # SOH check [DP] - back-up pre-maneuver table load and check-out - enable propulsion bus TDRS_10 THEMIS_C -9.400 2010/057 08:28:00 2010/057 09:10:00 TR2 # ---> Apogee raise maneuver [DP] - P2 ORM 27A - MAN ID 376 - nominal burn #--------------------------------------------------------------------------------- # 2010/057 - 2010/058 Friday, February 26 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2010/057 17:15:25 2010/057 17:41:15 TR7 # Data dump DSS_54 THEMIS_C 9.500 2010/057 17:45:00 2010/057 20:00:00 TR6 # Data dump and track [JT] - post-maneuver VC1 and VC4 data dump - post-maneuver instrument operations BGS_11M THEMIS_A 9.100 2010/057 20:28:10 2010/057 20:39:25 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/057 20:54:25 2010/057 21:15:15 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/057 21:22:35 2010/057 21:40:00 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/057 21:45:00 2010/057 22:05:00 TR40 # Data dump BGS_11M THEMIS_B -2.500 2010/057 22:55:00 2010/057 23:45:00 TR1 # CW track - range 971,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 35.9 dB - # solid two-way RF lock with 100 W uplink and modulation off - 50 deg ele - rainy weather DSS_24 THEMIS_C 9.400 2010/058 07:15:00 2010/058 10:45:00 TR6 # Data dump and track #--------------------------------------------------------------------------------- # 2010/058 - 2010/059 Saturday, February 27 #--------------------------------------------------------------------------------- BGS_11M THEMIS_D 9.300 2010/058 17:11:45 2010/058 17:36:35 TR7 # Data dump BGS_11M THEMIS_E 2.660 2010/058 18:25:00 2010/058 18:55:00 TR2 # SOH check and track [JT] - pre-maneuver table load and check-out - enable propulsion bus BGS_11M THEMIS_A 9.100 2010/058 20:24:35 2010/058 20:35:40 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/058 20:50:40 2010/058 21:11:35 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/058 21:18:55 2010/058 21:36:10 TR30 # Data dump DSS_65 THEMIS_C 9.400 2010/058 21:20:00 2010/059 02:15:00 TR6 # Data dump and track [JT] - pre-maneuver table load and check-out - enable propulsion bus BGS_11M THEMIS_E 9.200 2010/058 21:41:10 2010/058 22:01:10 TR40 # ---> Apogee change maneuver [JT] - P4 SM1C_T3 - MAN ID 377 - 1 pulse - nominal burn - post-maneuver VC1 and VC4 data dump HBK_10M THEMIS_E 9.200 2010/058 22:46:00 2010/058 23:34:00 TR7 # Data dump [JT] - post-maneuver instrument operations (after 22:52:00) BGS_11M THEMIS_B -2.500 2010/058 22:55:00 2010/058 23:45:00 TR1 # CW track - range 997,000 km - 200 W uplink power - BGS at PM 100 Hz LBW - AGC level 37.3 dB - # solid two-way RF lock with 100 W uplink and modulation off - 59 deg ele - partly cloudy sky BGS_11M THEMIS_C 2.850 2010/059 02:33:15 2010/059 03:18:15 TR2 # SOH check and track - back-up pre-maneuver table load and check-out - enable propulsion bus DSS_24 THEMIS_C 9.400 2010/059 07:15:00 2010/059 12:45:00 TR6 # ---> Shadow deflection maneuver [ME] - P2 SDM 1 - MAN ID 378 - nominal burn - # post-maneuver VC1 and VC4 data dump - post-maneuver instrument operations (after 09:22:00) #--------------------------------------------------------------------------------- # 2010/059 - 2010/060 Sunday, February 28 #--------------------------------------------------------------------------------- DSS_65 THEMIS_B 9.500 2010/059 16:00:00 2010/059 19:30:00 TR2 # SOH check and track [GL] - load week 09 ATS BGS_11M THEMIS_D 9.300 2010/059 17:08:15 2010/059 17:32:00 TR7 # Data dump BGS_11M THEMIS_A 9.100 2010/059 20:21:15 2010/059 20:32:05 TR8 # Data dump BGS_11M THEMIS_A 9.100 2010/059 20:47:05 2010/059 21:07:55 TR20 # Data dump BGS_11M THEMIS_D 9.300 2010/059 21:15:20 2010/059 21:32:25 TR30 # Data dump BGS_11M THEMIS_E 9.200 2010/059 21:37:25 2010/059 21:57:25 TR40 # Data dump DSS_54 THEMIS_C 9.400 2010/060 01:50:00 2010/060 05:20:00 TR6 # Data dump and track