Detector 2 anneal 2012

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
Line 27: Line 27:
* 2013 February 5: The detector 2 high voltage was raised by another five steps (221 -> 226). This increase puts G2 at 4411 V, which is now the highest voltage of all our detectors.
* 2013 February 5: The detector 2 high voltage was raised by another five steps (221 -> 226). This increase puts G2 at 4411 V, which is now the highest voltage of all our detectors.
 +
 +
* 2013 February 13: The front slow event threshold for detector 2 was lowered from 0x88 to 0x58. This was done to see if the low-energy counts that troubled us before (at a lower HV) are still present or not.
 +
 +
* 2013 February 14: The front slow event threshold for detector 2 was lowered from 0x58 to 0x48 (at 044/19:08 UT) but was raised up again on the next orbit from 0x48 to 0x50 (at 045/20:47 UT).

Revision as of 17:19, 20 February 2013


Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox