Tohban Report 2009-03-18

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
(Data Gaps)
 
(6 intermediate revisions not shown)
Line 4: Line 4:
|tohban_name = Steven Christe
|tohban_name = Steven Christe
|tohban_email = schriste@ssl.berkeley.edu
|tohban_email = schriste@ssl.berkeley.edu
-
|next_tohban = TBD
+
|next_tohban = Albert Shih
}}
}}
Line 12: Line 12:
== Memory Management ==
== Memory Management ==
 +
 +
No data no problem.
== Data Gaps ==
== Data Gaps ==
Line 21: Line 23:
RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).
RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).
 +
Return to normal solar pointing will take place 20-mar.
 +
 +
The decimation state is CRAB(QUIET)/NORMAL.
-
[[Category:Tohban Report]]
+
[[Category:Tohban Report 2009]]
-
[[Category:Tohban]]
+

Latest revision as of 03:32, 1 March 2013


Tohban Reports
Start Date: 11 Mar 2009
End Date: 18 Mar 2009
Tohban: Steven Christe
Tohban email: schriste@ssl.berkeley.edu
Next Tohban: Albert Shih
List all reports



Contents

Solar Activity

The Sun has been free of active regions all week long and therefore the GOES level has remains extremely low. No activity to report.

Memory Management

No data no problem.

Data Gaps

No significant data gaps to report.

Spacecraft Operations

This week consisted of offpointing for quiet Sun measurements.

RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009). Return to normal solar pointing will take place 20-mar.

The decimation state is CRAB(QUIET)/NORMAL.

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox