Tohban Report 2009-03-18
From RHESSI Wiki
(Difference between revisions)
(New page: {{Infobox Tohban Report| |start_date = 11 Mar 2009 |end_date = 18 Mar 2009 |tohban_name = Steven Christe |tohban_email = schriste@ssl.berkeley.edu |next_tohban = TBD }} == Solar Activity ...) |
m (→Spacecraft Operations) |
||
Line 15: | Line 15: | ||
== Spacecraft Operations == | == Spacecraft Operations == | ||
This week consisted of offpointing for quiet Sun measurements. | This week consisted of offpointing for quiet Sun measurements. | ||
+ | |||
+ | RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009). | ||
[[Category:Tohban Report]] | [[Category:Tohban Report]] | ||
[[Category:Tohban]] | [[Category:Tohban]] |
Revision as of 23:40, 13 March 2009
Tohban Reports | |
---|---|
Start Date: | 11 Mar 2009 |
End Date: | 18 Mar 2009 |
Tohban: | Steven Christe |
Tohban email: | schriste@ssl.berkeley.edu |
Next Tohban: | TBD |
List all reports |
Contents |
Solar Activity
Memory Management
Data Gaps
Spacecraft Operations
This week consisted of offpointing for quiet Sun measurements.
RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).