Tohban Report 2009-03-18

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
(Data Gaps)
(Spacecraft Operations)
Line 21: Line 21:
RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).
RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).
 +
 +
The decimation state is CRAB(QUIET)/NORMAL.
[[Category:Tohban Report]]
[[Category:Tohban Report]]
[[Category:Tohban]]
[[Category:Tohban]]

Revision as of 17:46, 18 March 2009


Tohban Reports
Start Date: 11 Mar 2009
End Date: 18 Mar 2009
Tohban: Steven Christe
Tohban email: schriste@ssl.berkeley.edu
Next Tohban: TBD
List all reports



Contents

Solar Activity

The Sun has been free of active regions all week long and therefore the GOES level has remains extremely low. No activity to report.

Memory Management

Data Gaps

No significant data gaps to report.

Spacecraft Operations

This week consisted of offpointing for quiet Sun measurements.

RHESSI off pointing was executed successfully on DOY 071/19:42 (12-mar-2009).

The decimation state is CRAB(QUIET)/NORMAL.

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox