Tohban Report 2009-04-15

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
(New page: {{Infobox Tohban Report| |start_date = 8 Apr 2009 |end_date = 15 Apr 2009 |tohban_name = Pascal Saint-Hilaire |tohban_email = shilaire@ssl.berkeley.edu |next_tohban = ? }} == Solar Activi...)
Line 24: Line 24:
SSR fill level: crept up to 40% on April 9th,10th & 11th.
SSR fill level: crept up to 40% on April 9th,10th & 11th.
Now between 10 and 35%.
Now between 10 and 35%.
 +
== Data Gaps ==
== Data Gaps ==

Revision as of 20:03, 15 April 2009


Tohban Reports
Start Date: 8 Apr 2009
End Date: 15 Apr 2009
Tohban: Pascal Saint-Hilaire
Tohban email: shilaire@ssl.berkeley.edu
Next Tohban:  ?
List all reports



Contents

Solar Activity

The Sun was pretty featureless throughout the week. GOES 1-8A was flat. GOES 0.5-4 showed weak signs of life (~A0.6 level) for a few days.

Because of this tiny activity, and because recent 10.7cm flux measurements seem to trend upwards (http://sprg.ssl.berkeley.edu/~tohban/wiki/index.php/Cycle_24_-_don%27t_panic_yet%21), Hugh proposed on Monday morning to off-point, in order to try getting an X-Ray reading from RHESSI. Jeremy promptly obliged on 09-104-14:34:04 UT: "The attenuator logic was disabled and the crab decimation scheme was set. We are still collecting front segment data during the eclipse so no changes have been made in that regard. All operations went nominally."

Memory Management

Decimation: Crab mode SSR fill level: crept up to 40% on April 9th,10th & 11th. Now between 10 and 35%.


Data Gaps

GAPS IN APP_ID = 102 (VC3-MONITOR RATES) WITH PACKET RATE LT 30 N_GAPS 2 GAP START TIME GAP END TIME GAP (SEC) 2009-04-07T13:20:00.000 -- 2009-04-07T13:25:00.000 300.00000 2009-04-07T16:10:00.000 -- 2009-04-07T16:40:00.000 1800.0000


MISC.

I recommend removing all of our email addresses from the wiki. Ever since it went up, I have started receiving spam. It may not be too late!!

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox