Tohban Report 2009-06-17
From RHESSI Wiki
(Difference between revisions)
(New page: {{Infobox Tohban Report| |start_date = 10 June 2009 |end_date = 17 June 2009 |tohban_name = Pascal Saint-Hilaire |tohban_email = shilaire@ssl.berkeley.edu |next_tohban = TBD }} == Solar ...) |
|||
(2 intermediate revisions not shown) | |||
Line 4: | Line 4: | ||
|tohban_name = Pascal Saint-Hilaire | |tohban_name = Pascal Saint-Hilaire | ||
|tohban_email = shilaire@ssl.berkeley.edu | |tohban_email = shilaire@ssl.berkeley.edu | ||
- | |next_tohban = | + | |next_tohban = Pascal Saint-Hilaire |
}} | }} | ||
Line 13: | Line 13: | ||
== Memory Management == | == Memory Management == | ||
+ | SSR goes to 0% at the end of the daily pass set (max at 20%). | ||
Decimation was normal/active for the week. Front segment events are turned off during eclipses. | Decimation was normal/active for the week. Front segment events are turned off during eclipses. | ||
- | North | + | Still no rear decimation during North Magnetic Zone passages (David Smith's lightning stuff). |
- | + | ||
== Data Gaps == | == Data Gaps == | ||
- | + | 12 hours of VC1 data on June 13th has been lost, due to a problem at Wallops, and the fact that their backup tape was damaged... VC3 data is all there, though. | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | ...VC3 | + | |
- | [[Category:Tohban Report | + | [[Category:Tohban Report 2009]] |
- | + |
Latest revision as of 03:35, 1 March 2013
Tohban Reports | |
---|---|
Start Date: | 10 June 2009 |
End Date: | 17 June 2009 |
Tohban: | Pascal Saint-Hilaire |
Tohban email: | shilaire@ssl.berkeley.edu |
Next Tohban: | Pascal Saint-Hilaire |
List all reports |
Solar Activity
GOES 1-8A channel never budged from its bottommost level.
Memory Management
SSR goes to 0% at the end of the daily pass set (max at 20%). Decimation was normal/active for the week. Front segment events are turned off during eclipses. Still no rear decimation during North Magnetic Zone passages (David Smith's lightning stuff).
Data Gaps
12 hours of VC1 data on June 13th has been lost, due to a problem at Wallops, and the fact that their backup tape was damaged... VC3 data is all there, though.