Tohban Report 2009-12-02

From RHESSI Wiki

Jump to: navigation, search


Tohban Reports
Start Date: 25 November 2009
End Date: 02 December 2009
Tohban: Amir Caspi
Tohban email: cepheid@ssl.berkeley.edu
Next Tohban: Pascal Saint-Hilaire
List all reports



Contents

Solar Activity

Two small active regions (11032 and 11033) rotated off the disk over the weekend, but neither produced any significant activity; no RHESSI or GOES flares were recorded. Activity is minimal at the moment.

Memory Management

The SSR has been trending unusually high, getting up to ~70% early this week. This is most likely due to low-level noise from G2; no fix has yet been implemented, but David Smith is formulating a solution. As a stopgap, front segment data during eclipse was disabled starting Tuesday, to be re-enabled once the fill level zeros out.

Data Gaps

DATA GAPS FOR 2009/11/26
GAPS IN APP_ID = 1 (VC1-SOH) WITH PACKET RATE LT 30
GAP START TIME              GAP END TIME                   GAP (SEC)
2009-11-26T06:00:00.000 -- 2009-11-26T06:15:00.000       900.00000

Special Operations

A spin-up was performed on Tuesday, with no anomalies.

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox