Tohban Report 2011-07-20

From RHESSI Wiki

Revision as of 17:41, 19 July 2011 by Lglesener (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


Tohban Reports
Start Date: 13 July 2011
End Date: 20 July 2011
Tohban: Lindsay Glesener
Tohban email: glesener@ssl.berkeley.edu
Next Tohban: TBA
List all reports



Contents

Solar Activity

Memory Management

There was little change in memory fill level this week. During the eclipses, data was taken for 4 minutes at start and end (compared to the entire eclipse the week before). The SSR is not emptying after each pass. Pass frequency remains low because of THEMIS and Shuttle operations; it is expected that this problem will ease when we are back up to the usual number of passes per day (10 or so).

Data Gaps

Spacecraft Status

Detector 6 showed a few arcs in the previous week's data. A voltage stepdown of 20 steps took place on Tuesday. Detector 8 displayed some noise around 0430 on July 18, but the problem was not as bad as that noted in the last tohban report.

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox