Tohban Report 2015-01-07

From RHESSI Wiki

Jump to: navigation, search


Tohban Reports
Start Date: 31 Dec 2014
End Date: 7 Jan 2015
Tohban: Milo Buitrago-Casas
Tohban email: milo@ssl.berkeley.edu
Next Tohban:  ?
List all reports



Contents

Solar Activity

Solar activity was moderate this week with two M-class flares, several C-class flares and a handful of micro-flares that specially occurred at midlatitudes on Active Region 12253. This AR is still on the disk and has a good chance for a >M class flare. Currently there are 6 active regions on the disk, one is rotating off and two ARs will show up later today on the West limb.

How many GOES flares occurred?

 Flares above B, C, M, X class were      4    37     2     0

And how many of these are listed in the RHESSI flare list?

 Flares above B, C, M, X class were      2    26     2     0

And how many had EXCELLENT coverage?

 Flares above B, C, M, X class were      0     0     0     0

There were RHESSI flares/GOES flares 408 / 43 over the time range 30-Dec-14 06-Jan-15

Memory Management

The SSR was emptying by the end of the daily pass set during most of the week. Decimation was changed from Active/Vigorous to Normal/Vigorous on Dec 31, 2014 - 20:17 UTC. In addition,

There were no changes on night time event collection this week.

Spacecraft Status

Data Gaps

There was no significant data gap.

Detector issues

On January 5 at 14:57 UTC we changed thresholds on the front fast and front slow values for detector five [G5].

Threshold Front Fast Front Slow
Initial 0x60 0x80
Final 0x2E (same as initial G7) 0x10 (nominal value)

During the changes we tried to set the front fast threshold to the nominal value (0x22), but monitor rate in that case showed a very high value (around 700). Then we decided to set the front fast threshold to the same value that G7 initially had. Threshold front slow value was well-set to nominal. After these changes, monitor rates on G5 looked stable and in accordance with the other well-behaved segmented detectors (i.e. 1,3,6,8, and 9). Next Tohban should specially keep an eye on the behaviour of this detector.

D7 changes have been scheduled to next Wednesday morning.

Threshold Front Fast Front Slow
Initial 0x2E 0x10
Final 0x22 (nominal value) 0x0C (nominal value)

The other detectors looked still stable. Only detectors 2 and 4 continue unsegmented.

Light leak in D2 front, D9 rear and D5 rear.

Other notes

Spacecraft Management

Decimation Normal/Vigorous
HLAT Decimation Rear decimation weight 6, no front decimation
Night time data (fronts) +/- 4 minutes
Night time data (rears) full nighttime events
Require extra passes? No
Requirement for moving pointer? No
Attenuator operation Normal
Detector problems? D2 front and D9 rear light leak.
Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox