Weekly Report 21Jan2011

From RHESSI Wiki

Revision as of 14:32, 25 January 2011 by Agopie (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RHESSI Website Migration

The RHESSI Website Migration is ongoing. The following pages are ready for review:

There are a number of other pages close to completion, all pages except for software should be finished this week.

RHESSI Albedo Imaging Test

Pixon Images were made from calibrated eventlist files created last week, however I have not looked at them closely as yet (No plots of the flux versus radial distance from the peak or contour maps have been created)

Goals

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox