Tohban Report 2009-12-09
From RHESSI Wiki
(Difference between revisions)
(New page: {{Infobox Tohban Report| |start_date = 02 December 2009 |end_date = 09 December 2009 |tohban_name = Pascal Saint-Hilaire |tohban_email = shilaire@ssl.berkeley.edu |next_tohban = Jim McTie...) |
|||
Line 27: | Line 27: | ||
2) Switched to GOES 14 | 2) Switched to GOES 14 | ||
- | [[Category:Tohban Report | + | [[Category:Tohban Report 2009]] |
- | + |
Latest revision as of 03:22, 1 March 2013
Tohban Reports | |
---|---|
Start Date: | 02 December 2009 |
End Date: | 09 December 2009 |
Tohban: | Pascal Saint-Hilaire |
Tohban email: | shilaire@ssl.berkeley.edu |
Next Tohban: | Jim McTiernan |
List all reports |
Contents |
Solar Activity
A small A8 flare. Then back to nil. A bit of activity started in the last few hours (A1 as opposed to A0.1)
Memory Management
0% at end of pass set. No front segment data taken at night.
Data Gaps
None.
Special Operations
1) A change to detector 2's front segment slow event threshold has been made, prescribed by David. This change was made on 12/03 (337) at 20:22:44 UT. See email for more details.
2) Switched to GOES 14