Detector 2 anneal 2012

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
Line 17: Line 17:
* 2012 August 1:  In the past week detector 2 livetime has occasionally been compromised by the light leak problem.  No action is being taken, since we do not want to impair low-energy spectroscopy.
* 2012 August 1:  In the past week detector 2 livetime has occasionally been compromised by the light leak problem.  No action is being taken, since we do not want to impair low-energy spectroscopy.
 +
 +
* 2012 November 6: There was a bit of noise on detector 2, so the front slow threshold was raised from 0x60 to 0x78.  This may help with the SSR fill level issues we have been seeing recently.

Revision as of 23:10, 7 November 2012


Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox