[[File:276f2.png|400px|thumb|center| Figure 1: Engineering overview of
[[File:276f2.png|400px|thumb|center| Figure 1: Engineering overview of
the "cold plate" temperature of the RHESSI cryocooler, covering many years
the "cold plate" temperature of the RHESSI cryocooler, covering many years
-
of operation.
+
of operation (degrees K).
The five large positive excursions are the times of the five anneal
The five large positive excursions are the times of the five anneal
operations thus far carried out.
operations thus far carried out.
 +
Much of the short-term fluctuation results from periodic orbital variations in the day/night duty cycle.
]]
]]
The temperatures are approaching the point where some detectors lose  
The temperatures are approaching the point where some detectors lose  
-
[http://sprg.ssl.berkeley.edu/~tohban/nuggets/?page=article&article_id=27 segmentation],
+
[http://sprg.ssl.berkeley.edu/~tohban/nuggets/?page=article&article_id=27 segmentation].
-
and thus will not function so well as gamma-ray spectrometers, because the
+
If this happens they will not function so well as gamma-ray spectrometers, because the
[https://en.wikipedia.org/wiki/Electronic_anticoincidence anticoincidence]  
[https://en.wikipedia.org/wiki/Electronic_anticoincidence anticoincidence]  
between independent front and rear segments will no longer
between independent front and rear segments will no longer
Line 61: Line 62:
perform its core function of hard hard X-ray imaging spectroscopy.
perform its core function of hard hard X-ray imaging spectroscopy.
-
To postpone the loss of segmentation specifically to be able to observe
+
To postpone the loss of segmentation, specifically to be able to observe
-
the last gamma-ray flares of Cycle 24, we we now plan to operate RHESSI in a  
+
the last few gamma-ray flares of Cycle 24, we we now plan to operate RHESSI in a  
low-power mode.
low-power mode.
-
Since the detectors dissipate some heat in the cryocooler, turning some  
+
Since the detector amplifiers dissipate some tiny amounts of heat in the cryocooler, turning some  
of them off can decrease the rate of temperature increase.
of them off can decrease the rate of temperature increase.
-
Thus we now keep some of the detectors switched off except during times of  
+
Thus we now plan to  keep all but two of the detectors switched off except during times of  
high solar activity and for special support activities.
high solar activity and for special support activities.
For example, at the time of writing, we are operating Detectors 3 and 8.
For example, at the time of writing, we are operating Detectors 3 and 8.
Line 78: Line 79:
adequate for imaging and spectroscopy at a basic level.  
adequate for imaging and spectroscopy at a basic level.  
 +
In our new operating scheme, the full complement of detectors will be turned on at times of exceptionally
 +
high activity, or to support specific observing campaigns.
 +
These might include the first solar observations with the
 +
[http://www.ssalmon.uio.no ALMA]
 +
radio telescope, possibly to be scheduled for a week or two at the end of 2016 or beginning of 2017.
== The future ==
== The future ==
 +
 +
RHESSI has returned successfully from its fifth annealing operation and we are now obtaining data in
 +
a slightly different mode.
 +
This involves using a reduced detector set to improve the temperature performance in the hopes of retaining
 +
full functionality for gamma-ray observations in any final major activity of Cycle 24.
 +
At present we are operating detectors 3 and 8, for example, and find these to be sufficient for the core
 +
mission of hard X-ray imaging spectroscopy.

Revision as of 06:27, 17 June 2016


Nugget
Number: 276
1st Author: Brian Dennis
2nd Author: Säm Krucker
Published: 20 June 2016
Next Nugget: TBD
Previous Nugget: Non-thermal free-bound emission
List all



Introduction

As described in Nugget 269, RHESSI began its 5th anneal cycle on February 23. The annealing process involves raising RHESSI's detectors to an elevated temperature, during which the crystal structure can realign itself and erase dislocations produced by high-energy particle interactions. The data flow ceased during the annealing operation, but again the instrument was restored to health, and routine observations have resumed in a slightly modified operational scheme. Figure 1 shows images of SOL2016-05-24T10:20 (C1.3), illustrating RHESSI's essential capability for hard X-ray imaging spectroscopy.

Figure 1: Images in two spectral bands of SOL2016-05-24T10:20 (C1.3).

Another example in the quicklook Browser service confirms RHESSI's sensitivity to a weaker event: SOL2016-06-09 (B3.0). This is a nice microflare with type III radio emission.

Functionality

As the cryocooler ages, the operating temperatures of the detectors have continued to increase very slowly. Figure 2 shows this via a routine engineering plot, showing a key temperature value over the full life of RHESSI thus far. The temperature increase presumably results from the normal ageing of the cryocooler, and we expect it to continue indefinitely into the future.

Figure 1: Engineering overview of the "cold plate" temperature of the RHESSI cryocooler, covering many years of operation (degrees K). The five large positive excursions are the times of the five anneal operations thus far carried out. Much of the short-term fluctuation results from periodic orbital variations in the day/night duty cycle.

The temperatures are approaching the point where some detectors lose segmentation. If this happens they will not function so well as gamma-ray spectrometers, because the anticoincidence between independent front and rear segments will no longer be possible, and the background counting rate will increase substantially. Even without detector segmentation, though, we expect that RHESSI will still perform its core function of hard hard X-ray imaging spectroscopy.

To postpone the loss of segmentation, specifically to be able to observe the last few gamma-ray flares of Cycle 24, we we now plan to operate RHESSI in a low-power mode. Since the detector amplifiers dissipate some tiny amounts of heat in the cryocooler, turning some of them off can decrease the rate of temperature increase. Thus we now plan to keep all but two of the detectors switched off except during times of high solar activity and for special support activities. For example, at the time of writing, we are operating Detectors 3 and 8. As shown in Figure 1, this still allows us to obtain hard X-ray images, time series, and spectra as before, but the images have less (u,v)-plane coverage. Users of RHESSI observations from this point on should be aware that for most of the time only two detectors may be operating. These will not always be the same ones, but as seen in Figure 1, they will be adequate for imaging and spectroscopy at a basic level.

In our new operating scheme, the full complement of detectors will be turned on at times of exceptionally high activity, or to support specific observing campaigns. These might include the first solar observations with the ALMA radio telescope, possibly to be scheduled for a week or two at the end of 2016 or beginning of 2017.

The future

RHESSI has returned successfully from its fifth annealing operation and we are now obtaining data in a slightly different mode. This involves using a reduced detector set to improve the temperature performance in the hopes of retaining full functionality for gamma-ray observations in any final major activity of Cycle 24. At present we are operating detectors 3 and 8, for example, and find these to be sufficient for the core mission of hard X-ray imaging spectroscopy.