Tohban Report 2009-12-09

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
(New page: {{Infobox Tohban Report| |start_date = 02 December 2009 |end_date = 09 December 2009 |tohban_name = Pascal Saint-Hilaire |tohban_email = shilaire@ssl.berkeley.edu |next_tohban = Jim McTie...)
 
Line 27: Line 27:
2) Switched to GOES 14
2) Switched to GOES 14
-
[[Category:Tohban Report]]
+
[[Category:Tohban Report 2009]]
-
[[Category:Tohban]]
+

Latest revision as of 03:22, 1 March 2013


Tohban Reports
Start Date: 02 December 2009
End Date: 09 December 2009
Tohban: Pascal Saint-Hilaire
Tohban email: shilaire@ssl.berkeley.edu
Next Tohban: Jim McTiernan
List all reports



Contents

Solar Activity

A small A8 flare. Then back to nil. A bit of activity started in the last few hours (A1 as opposed to A0.1)

Memory Management

0% at end of pass set. No front segment data taken at night.

Data Gaps

None.

Special Operations

1) A change to detector 2's front segment slow event threshold has been made, prescribed by David. This change was made on 12/03 (337) at 20:22:44 UT. See email for more details.

2) Switched to GOES 14

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox