Weekly Report 23Jul2010 30Jul2010

From RHESSI Wiki

(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
==Weekly Report 23Jul2010 30Jul2010==
==Weekly Report 23Jul2010 30Jul2010==
===Simulated Point Source with Albedo using VIS FWDFIT===
===Simulated Point Source with Albedo using VIS FWDFIT===
 +
An eventlist for a point source with albedo was created for an event near limb. As shown in the previous report various imaging techniques were used to reconstruct the RHESSI images. This report focuses on using Forward Fit Techniques to image the albedo and it's foreshortening near the limb.

Revision as of 20:36, 31 July 2010

Weekly Report 23Jul2010 30Jul2010

Simulated Point Source with Albedo using VIS FWDFIT

An eventlist for a point source with albedo was created for an event near limb. As shown in the previous report various imaging techniques were used to reconstruct the RHESSI images. This report focuses on using Forward Fit Techniques to image the albedo and it's foreshortening near the limb.

Personal tools
Namespaces
Variants
Actions
Navigation
Toolbox